How to Request a Quote for Custom Solid Aluminum Panels

For a quotation-ready custom solid aluminum panel RFQ, send the latest elevation or panel layout, a BOQ or panel schedule, and mark each value as confirmed, provisional or open. This helps every supplier price the same scope instead of filling gaps with different assumptions.

This checklist is for flat, folded, curved and custom-shaped solid aluminum panels, including perforated panels made from solid aluminum sheet. It does not cover ACP, honeycomb panels, expanded metal mesh or ceiling systems.

What a Quotation-Ready Panel Schedule Should Include

FieldWhat the buyer should provideWhy it matters
Panel markA unique mark for each panel typeConnects the quotation to the drawing and quantity
Elevation or zoneFacade, floor, grid line, entrance, window area or other locationShows where the panel belongs
Drawing referenceDrawing number, revision and issue datePrevents pricing from an outdated layout
Panel formFlat, folded, curved, custom-shaped or perforated from solid sheetDefines the fabrication scope
DimensionsFace size, return depth, radius or opening reference where applicableRecords the geometry being priced
QuantityPieces by panel mark, plus total area if availableMakes supplier quotations comparable
ThicknessConfirmed value, provisional value or supplier review requestedSeparates a stated requirement from an open item
Surface finishFinish system, colour, gloss and sample statusRecords what is known and what still needs approval
InterfacesWindow, glazing, structure, fixing and adjacent trade notesIdentifies scope that drawings must clarify
Project and deliveryProject stage, packing sequence and delivery countryGives context for quotation and packing review

Use the solid aluminum panel specification guide for the general product scope. If thickness is still being reviewed, keep that question in the 2.0, 2.5 and 3.0 mm thickness guide rather than repeating the full explanation in the RFQ.

Mark Every Input as Confirmed, Provisional or Open

A quotation should not make an open design item look approved. Add one status beside each thickness, return, radius, perforation reference, finish and interface note:

  • Confirmed: stated in the current drawing, BOQ or written project requirement.
  • Provisional: used for budget comparison and still subject to project review.
  • Open: missing or unresolved and requiring a question before a firm scope can be prepared.

A budget request, a comparable supplier quotation and a production release are different document stages. A preliminary quotation should not be treated as approval for fabrication.

Project Example: Link Panel Marks to Drawings

In PUNCHUK’s Hainan new energy office project, A, B and C elevations were used to coordinate panel segmentation around window openings, recessed areas, entrances and corner transitions. The documented specification was 3.0 mm 3-series solid aluminum with a white three-coat PVDF finish.

That project shows why an RFQ should connect each panel mark to its location, geometry, finish and drawing revision. Read the Hainan solid aluminum panel project for the project sequence and recorded specification.

Record Repeated Geometry and Interface Boundaries

Repeated window bays still need a clear panel breakdown. In Jack’s PUNCHUK project images, chamfered window heads, vertical reveals and continuous panel joints repeat across several openings. A useful RFQ should state which dimensions repeat and which panels change by location.

Repeated chamfered window heads, vertical reveals and panel-joint alignment in a PUNCHUK project.

Installation-stage images also show a panel band meeting a glazed corner while nearby substrate remains open. For this type of junction, the RFQ should identify the panel-to-glass boundary, the current project stage and any closure detail that is not yet confirmed. Visible geometry can guide the question, but the drawing remains the pricing reference.

Installation-stage panel-to-glass corner showing why interface scope and project stage belong in the RFQ.

Before Sending the RFQ

Check that the package contains:

  • the latest elevation, section or panel layout;
  • a BOQ or panel schedule with panel marks and quantities;
  • the panel form and dimensions for flat, folded, curved, custom-shaped or perforated-from-solid-sheet work;
  • thickness and finish information, with open items clearly marked;
  • interface notes for windows, glazing, structure and fixings;
  • project stage, packing or installation sequence needs, and delivery country.

For a solid sheet project, review custom exterior aluminum wall panels before naming the panel type in the RFQ. When the package is ready, send the drawings and BOQ for review.

Send your current CAD or PDF drawings, BOQ and panel schedule, quantity, proposed thickness, surface finish, project stage and delivery country. Mark any open scope at windows, glazing, structure, fixings or packing so PUNCHUK can review what is ready for quotation and list the missing inputs.

en_USEnglish
Scroll to Top